| Who is online? | In total there are 2 users online :: 1 Registered, 0 Hidden and 1 Guest ChopperMost users ever online was 79 on Wed Dec 29, 2010 10:06 am |
| Latest topics | » Look what came today!(Updated with Pics!) by rellison8 Fri Oct 14, 2011 5:00 pm
» Anyone got room for a family in the QCA? by Chopper Thu Sep 22, 2011 7:38 pm
» 2012 Schedule is set! by bustinbeaks Thu Sep 01, 2011 10:57 am
» DNR Proposes to Change “No-Wake” by bustinbeaks Thu Jul 21, 2011 9:13 am
» Well, I guess we are going to own a campground. by brittlab Wed Jul 20, 2011 5:14 pm
» New members welcome! by Chopper Sun Jun 19, 2011 6:23 am
» Thanks for the invite! by Hymes Inc. Thu Jun 16, 2011 5:44 pm
» Random Tweets! by rellison8 Fri May 20, 2011 4:33 pm
» Well I know its just nascar! by rellison8 Tue Feb 22, 2011 8:20 am
» Legislators seek end to Lake Macbride horsepower limits by manho Mon Feb 21, 2011 6:55 pm
|
| Statistics | We have 50 registered users The newest registered user is whip2
Our users have posted a total of 38354 messages in 3039 subjects
|
| February 2012 | | Sun | Mon | Tue | Wed | Thu | Fri | Sat |
|---|
| | | | 1 | 2 | 3 | 4 | | 5 | 6 | 7 | 8 | 9 | 10 | 11 | | 12 | 13 | 14 | 15 | 16 | 17 | 18 | | 19 | 20 | 21 | 22 | 23 | 24 | 25 | | 26 | 27 | 28 | 29 | | | | Calendar |
|
| | | Author | Message |
|---|
Cowboy F4F Superstar!!!!!


Number of posts: 2677 Age: 42 Location: Fairfield, Iowa Job/hobbies: Civil Engineering/Fish and Hunt Iowa Registration date: 2008-04-09
 | Subject: Lake Darling Renovations Thu May 14, 2009 11:31 am | |
| Lake Darling Set For Summer-Long Construction Work
Construction at Lake Darling State Park is expected to begin as soon as the ground is dry. This major renovation includes the construction of a new dam and spillway as well as sediment ponds, shoreline armament and fish habitat.
Dredging and beach work will also be completed at this time. Currently, The University of Iowa is conducting archeological investigations at the proposed dam and spillway site to ensure proper cultural resource management.
The design of the new dam and spillway by French-Reneker-Associates includes dam realignment, a concrete pipe principal spillway and two earthen auxiliary spillways. Also, to avoid the poor soil conditions directly under the existing spillway, a portion of the dam will be moved downstream.
“We expect to be ready for dam project bidding this July and for construction to begin this August,” French-Reneker engineer Kent Rice said. Summer construction also includes dredging an expected 300,000 cubic yards of sediment from the southeast and southwest ends of the lake.
“Because the majority of material targeted to be removed is vegetated, hydraulic dredging is not an option and the lake bottom must be dry to begin this part of construction,” DNR engineer Heath Delzell said. “Also, using scrapers and bulldozers is generally much more economical than hydraulic dredging.”
Also at this time, 21 sediment ponds will be built and eight road culverts will have extensions installed. Shoreline riprap will also be installed and rubble and other recycled waste from the old spillway will be used to create fish habitat within the lake as well as the beach area will be seeded and the sand portion will be relocated to a higher elevation.
“The dam construction and lake restoration is a big and exciting project,” Delzell said. “We just hope for a dry year that will let us accomplish much of the construction this summer and fall.”
The projected completion date of the entire project is fall 2010. |
|  | | Basshawk F4F Superstar!!!!!


Number of posts: 2133 Age: 59 Location: North Liberty, IA Job/hobbies: Work at UIHC in Bioengineering as a BMET Sr, CBET Registration date: 2008-04-09
 | Subject: Re: Lake Darling Renovations Thu May 14, 2009 11:35 am | |
| Very interesting. Sounds like there are a few changes in the works. |
|  | | rellison8 Admin!


Number of posts: 9164 Age: 34 Location: West Point, Ia Job/hobbies: Manage Lumberyard/ Fishin & Wheelin Registration date: 2008-04-09
 | Subject: Re: Lake Darling Renovations Thu May 14, 2009 12:46 pm | |
| Good info Shannon. Thanks for sharing. I can't wait for that place to be done and full of new dumb bass too.  _________________ Randy Ellison
|
|  | | quackjr Regular Contributor!


Number of posts: 736 Age: 32 Location: Washington, IA 52353 Job/hobbies: Engineering Registration date: 2008-04-15
 | Subject: Re: Lake Darling Renovations Thu May 14, 2009 1:13 pm | |
| This is great news, so the whole lake is gonna be like 30' deep now right?? So when I build a house on Amy's dad's land across the road, I can catch the walleye they are going to stock n there...  |
|  | | hoserhawk F4F Superstar!!!!!


Number of posts: 1570 Age: 29 Location: Fairfield, IA Job/hobbies: Engineering Tech/Hunting, Fishing, Poker Registration date: 2008-04-09
 | |  | | poncho Forum Regular!


Number of posts: 492 Age: 39 Location: washington Job/hobbies: maintenance mechanic / boiler operator. Hunting and fishing, Registration date: 2008-08-08
 | |  | | fishrman F4F Superstar!!!!!


Number of posts: 3698 Location: Mt. Pleasant, Iowa Job/hobbies: Hunting and fishing are my primary hobbies with lots of secondary hobbies. Registration date: 2008-04-09
 | Subject: Re: Lake Darling Renovations Thu May 14, 2009 5:33 pm | |
| Hope they get it right this time! Be great to have BVD, Darling, Big Hollow, Wapello and others again! |
|  | | quackjr Regular Contributor!


Number of posts: 736 Age: 32 Location: Washington, IA 52353 Job/hobbies: Engineering Registration date: 2008-04-15
 | |  | | poncho Forum Regular!


Number of posts: 492 Age: 39 Location: washington Job/hobbies: maintenance mechanic / boiler operator. Hunting and fishing, Registration date: 2008-08-08
 | Subject: Re: Lake Darling Renovations Sun May 17, 2009 5:22 pm | |
| |
|  | | |
Similar topics |  |
|
| | Permissions in this forum: | You cannot reply to topics in this forum
| |
| |
| |